1882 |
Forging started at the Sumitomo Besshi Mine Shop |
1885 |
Casting started at the Sumitomo Bessi Mine Shop |
1931 |
Old casting plant was completed |
1934 |
Incorporated as Sumitomo Machinery Co In-house supplier of castings and forgings |
1937 |
Roll plant completed |
1940 |
Changed to be Sumitomo Machinery Industries Co |
1944 |
Relocated forging plant to Isoura |
1945 |
Changed to be Shikoku Machinery Industries Co |
1952 |
Restored to be Sumitomo Machinery Industries Co |
1953 |
DCI rolls manufactured first in Japan |
1954 |
Established Foundry Division |
1955 |
Started Sales outside |
1956 |
Renamed to be Foundry |
1960 |
Roll Section independent from Foundry Division |
1969 |
Renamed to be Sumitomo Heavy Industries Co |
1974 |
Completed highly modernized cast steel foundry |
1975 |
Development of SIP-DCI heat treatment technology |
1980 |
Established Sumitomo Heavy Industries Foundry |
1986 |
World-first product by Osprey Spray Deposition Process |
1987 |
Completed one of the Japan's largest vertical centrifugal casting machine |
1988 |
Completed surface hardening foundry |
1990 |
Completed Osprey Spray Deposition Plant |
1995 |
Completed overall facilities for high-speed tool steel roll manufacture |
1999 |
Acquired ISO 14001 certification |
2000 |
Established 신일본 체인 |
2001 |
Renamed to be Sumitomo Heavy Industries Himatex Co became a 100% owned subsidiary |
2002 |
Acquired ISO 9001 certification |
2004 |
Completed inclinable small-sized centrifugal casting machine |
2005 |
Withdrawal from cast steel business |
2006 |
Transferred Slide Gato business to Kurosaki Harima Corporation |
2007 |
Introduction of entire equipment for adamite and graphitic steel roll production Developed a new type ductile iron roll with an |
2008 |
Acquired Shin Nippon Chain Fuel conversion from heavy oil to LP-gas for a heat treating furnace applied Introduction of TPS(Toyota Production System)to shorten lead time for roll |
2009 |
Relocation of machining shop for small-and-medium sized rolls to lsoura District Introduction of a machining center with fine-face machining equipment and three NC lathes into the machine shop Fuel conversion to LP-gas for another roll heat treating furnace |
2010 |
Large lathe for machining large rolls such as blooming rolls and billeting
|
2011 |
Emission spectral analysis apparatus renewed |
2012 |
Lead time shorted 30 days by project activities based upon TPS(Toyota Production |
2013 |
HBS(Sumitomo Heavy Industries Himatex Business School)opened Start of cost reduction activity based upon TPS High speed tool steel based roll with a higher resistance to heat crackings for roughing train was developed |
2014 |
Opening of SHI Himatex Management School(first term) 오카다 호텔 카지노 new technology for hard facing 오카다 호텔 카지노 new type roll material for a new application |
2015 |
Start of second term of SHI Himatex Management School Renewal of a roll foundry overhead crane to a latest speed-control type(125tons/50tons) |
|